SERVICE 01 — FULL RENOVATIONS
A full renovation takes the room back to its frame and rebuilds every layer you won’t see again: services, membrane and tile bed, before the tiles and fixtures go on. For homes in Moorabbin and nearby suburbs, it’s the right call when patching the old bathroom no longer makes sense.
Strip-out: timber frame, insulation and wiring exposed before services are re-run.
01/A — SCOPE
A full bathroom renovation replaces the whole wet area rather than one worn part of it. Old tiles, linings, fixtures and screed come out, and the room is rebuilt in a fixed order: plumbing and electrical rough-in, waterproofing, tiling, then fixtures and finishing.
It suits bathrooms where the layout no longer works, where tiles, vanity and shower are all due at once, or where water damage has spread beyond the shower. If the problem really is confined to one shower recess, Leaking Shower Repairs may be the smaller first step worth assessing.
Each trade depends on the one before it, so the work runs as a single coordinated project, not a string of separate jobs booked in isolation. That order is what keeps a new bathroom from repeating the faults of the old one.
01/B — OPTIONS
Keep the existing plumbing positions, or move the shower, toilet and vanity to suit how the room is really used. Relocating services opens up more options and adds work, so it’s settled early.
Walk-in or screened shower, bath or no bath, wall-hung or floor-standing vanity, concealed or exposed tapware. Each choice sets rough-in positions before the walls are closed.
Tile format, surface finish and grout colour, floor waste style, benchtops and cabinetry. Large-format tiles, mosaics and feature bands each call for different substrate preparation.
Finished bathroom with a glass shower, marble-look wall tiles, patterned feature bands and grey vanities.
01/C — MEMBRANE
The part of a bathroom that decides how well it lasts is the part nobody sees. Waterproofing goes on after the services are roughed in and before a single tile is laid, covering the shower floor, wall junctions and the other wet zones that need protection.
Getting falls to the floor waste right, sealing every penetration and letting the membrane cure all happen at this stage. Rushing it to reach tiling sooner is how a new bathroom ends up with the old leak. Read the Bathroom Waterproofing Guide, or see how Waterproofing fits into the rebuild.
01/D — SEQUENCE
Every full renovation follows the same order, so decisions are made before anything is demolished. The renovation process page covers each step in more depth.
01 Consultation
Talk through the room, how it’s used and what has to change.
02 Assessment
Check structure, plumbing, drainage and signs of water damage.
03 Design
Settle layout, fixtures and materials.
04 Quote
Price the agreed scope of work.
05 Materials
Confirm and order tiles, fixtures and fittings.
06 Demolition
Strip the room back to frame and substrate.
07 Plumbing/Electrical
Rough in services to suit the new layout.
08 Waterproofing
Apply the membrane to wet areas and allow it to cure.
09 Tiling
Bed and lay floor and wall tiles.
10 Fixtures
Install vanity, shower, toilet and tapware.
11 Finishing
Silicone, accessories, clean-up and final checks.
12 Handover
Walk through the finished bathroom together.
01/E — QUESTIONS
More answers on the Bathroom Renovation FAQs page, or ask directly through the contact page.
Often, yes. Whether the shower, toilet or vanity can move depends on the existing drainage, structure and where services can run. That’s checked at the assessment step and resolved during design, before anything is ordered.
It comes down to room size, how much of the layout changes, the condition found behind the walls, and the tiles and fixtures chosen. The quote follows design so it prices the actual scope. The Bathroom Renovation Cost Guide explains each factor.
That depends on scope, material lead times and curing between stages such as waterproofing and tiling. How Long Does a Bathroom Renovation Take? walks through the timeline step by step.
Not always. A leak isolated to the shower recess can sometimes be repaired on its own. When damage has spread or the rest of the room is also due for replacement, rebuilding the whole wet area is usually the more sensible route. Assessment shows which applies.
Full renovations are carried out in Moorabbin and nearby suburbs including Highett, Hampton East, Bentleigh, Bentleigh East, Cheltenham, Mentone and Heatherton. See Service Areas.
01/F — NEXT STEP
Tell us about the bathroom, your suburb and what isn’t working. Consultation and assessment come first, so the design and quote reflect the room you actually have.
Bathroom Design →
Waterproofing →
Bathroom Tiling →
Bathroom Renovation Cost Guide →
Bathroom Renovation Checklist →
Bathroom Projects →
Each published project will show the location, bathroom type, client brief, before and after images, design solution, materials and final result.