Reference photo · Wall preparation in a stripped bathroom
JOB SHEET · WORK STAGES · MOORABBIN
A finished bathroom only shows you the last stage. This page goes through the stages that come before it: strip-out, substrate, surface preparation, tiling and finishing. The reference photos show each kind of work in progress, so you can see what happens to the room between the first assessment and the final clean-up.
By Ivan Bodnar
Bathroom Renovation Specialist · approximately 15 years of hands-on residential renovation experience
01—02
STRIP-OUT & SUBSTRATE
Old tiles, fittings and finishes come out carefully so the walls and floor underneath can be seen properly. This is the point where a bathroom stops being a guess. Cracked grout and loose tiles on the surface can sit over sound sheeting, or over damage that has been building for years.
Concealed conditions found at this stage can change the scope of the job. Ivan explains what he has found and what it means before the work moves on.
Not every bathroom needs a full strip-out. Patch It Up or Strip It Back Properly? explains how to tell the difference.
Reference photo · Strip-out back to the structure
Once the room is open, the substrate gets checked: wall sheeting, the floor base, and anything that needs repairing or replacing before new surfaces go on. Everything that follows depends on this stage.
If the job includes plumbing or electrical work, it usually happens here. That work is carried out by appropriately licensed specialists, and Ivan coordinates them, so you still deal with one person directly. Coordinating Licensed Specialists explains how that works.
03
SURFACE PREPARATION
Reference photo · Smoothing compound during surface preparation
Tiles only sit as flat and as true as the surface behind them. Surface preparation covers patching and plastering, checking walls and floors for level, and getting every surface clean, sound and ready for adhesive. You won’t see any of it once the room is finished, and it is the stage Ivan is least willing to rush. After approximately 15 years of hands-on renovation work, his view is that proper preparation matters as much as the visible result.
— Repairing or replacing damaged wall sheeting and plasterboard
— Patching, setting and smoothing wall surfaces
— Checking walls and floors for level before setting out tiles
— Cleaning back so adhesive bonds to a sound surface
Read the full Preparation-First Renovation Process, or see Plasterboard Installation and Plastering.
04—05
TILING & FINISHING
Tiling. With the surfaces ready, wall and floor tiles are set out, laid and spaced so the joints stay consistent across the room. Good setting-out decides where the cut tiles land and how the room looks when you walk in. See Wall and Floor Tiling and Flooring Installation.
Finishing. Grouting, the final interior finishing, and fixtures being fitted, with licensed specialists handling any regulated connections. Then the room is cleaned and checked over before Ivan signs it off.
Reference photo · Setting wall tiles with spacers
Reference photo · A finished bathroom, for reference
BEFORE YOUR ASSESSMENT
Before you get in touch, it helps to note a few things about your bathroom. The assessment decides the scope, but these notes give it a useful starting point:
☐ What bothers you most: dated, damaged, hard to clean, or no longer suits you
☐ Visible wear on tiles, grout, fittings or finishes, and where it is
☐ Any spots where you suspect water damage behind the surface
☐ Anything you would like to keep, and anything that has to go
For background on the first line, read Signs Your Bathroom Needs Renovating.
RELATED LINES ON THE SHEET
BATHROOM RENOVATIONS IN MOORABBIN
WHAT AFFECTS BATHROOM RENOVATION COSTS
0413 142 055
Text or call · hours by arrangement