Home  /  Bathroom Renovation Questions

JOB SHEET · QUESTIONS · MOORABBIN

Bathroom Renovation Questions

Before you pick up the phone, you probably want a few things settled. What will it cost? Who does the plumbing? Who turns up on the day? Here are plain answers from Ivan Bodnar, an independent bathroom renovation specialist with approximately 15 years of hands-on residential renovation experience.

Worker wearing a hard hat and respirator checking a wall with a spirit level and marking measurements on drywall in a bright interior.

Reference photo · Checking a wall before any finish goes on

ON THIS SHEET

Five questions worth asking first

Every answer below comes back to the same idea: your bathroom gets assessed in person before anyone commits to a scope or a figure.

01

How much will my bathroom renovation cost?

It depends on four things: materials, preparation, project scope and the condition of the property. Two bathrooms of the same size can end up very differently once the old tiles come off. One has a sound substrate and needs light preparation. The other needs walls re-sheeted and the floor brought back before a single tile can go down.

That’s why Ivan won’t put a figure on a bathroom he hasn’t seen. After an assessment he’ll explain what he can confirm, what is still uncertain, and which concealed conditions could change the scope once work begins. You get the reasoning behind the number, not just the number.

For a fuller explanation, read What Affects Bathroom Renovation Costs.

Gloved worker spreading ridged tile adhesive across a floor with a notched trowel, with tile levelling clips visible nearby.

Once the old tiles come off, the floor is prepared before anything new goes down

02

LICENSED TRADES

Do you do the plumbing and electrical work?

No. Ivan doesn’t carry out licensed plumbing or electrical work himself. Most bathroom renovations need some of it, whether that’s moving a waste outlet, replacing a mixer or changing lighting and power points. When yours does, Ivan coordinates appropriately licensed specialists for those parts of the job.

His own work covers the stages he knows best: strip-out, surface preparation, plasterboard and plastering, wall and floor tiling, and interior finishing. The plumbing and electrical work goes to the people authorised to do it, and that’s said plainly from the start. More detail is on Coordinating Licensed Specialists.

03

Who will I actually deal with?

SIGNED OFF BY · IVAN BODNAR

Ivan, directly, from the first assessment to completion. He’s an independent sole trader, not a large renovation company, so there’s no sales team between you and the person doing the work.

He learned the trade alongside his father, then built his skills working with tradespeople and renovation teams, including as a subcontractor. He went independent to build his own professional reputation and take personal responsibility for every project he takes on. He has worked in Melbourne since 2019, and his work centres on Moorabbin and the surrounding Melbourne suburbs.

Read more in About Ivan Bodnar.

04 · GETTING IN TOUCH

How do I get in touch?

Send a text or a website enquiry describing your bathroom. A few lines are enough: what’s wrong with the room now, what you’d like it to become, and roughly where you are. Calls and site visits happen by arrangement, any day of the week.

A short, clear description helps Ivan understand the job before he comes out to assess it.

Text or call · by arrangement

05

What isn't offered?

No 24-hour emergency service. This is planned renovation work, not a call-out service.

No guaranteed same-day attendance. Visits are made by arrangement.

No instant online quotes. An online figure can’t replace someone looking at your walls, floor and substrate in person.

Not sure your bathroom needs a full renovation at all? Start with Patch It Up or Strip It Back Properly?, or see how the work runs in the Preparation-First Renovation Process.