What Affects Bathroom Renovation Costs

Four things shape what a bathroom renovation costs: materials, preparation, scope and the condition of the property. Here’s how each one works, and why you get a more useful answer from an assessment than from a number pulled out of thin air.

By Ivan Bodnar
Bathroom Renovation Specialist · approximately 15 years of hands-on residential renovation experience

Demolished residential room with temporary steel support posts, exposed structural areas, rubble, plaster fragments, tools and open windows.

Strip-out stage: what’s under the surface shapes the scope

JOB SHEET · COSTS

00

Two bathrooms the same size can be very different jobs

Most homeowners want to know the cost first, and that’s fair enough. The catch is that floor area tells you very little. Cost depends on what’s going in, what has to happen underneath, how much of the room is changing and what condition the room turns out to be in.

At an assessment, Ivan goes through each of these with you. He’s plain about what he can confirm on the day, what stays uncertain and what could change the scope or cost once work begins.

1/4

FACTOR · MATERIALS

What goes into the room

The tiles, fittings, fixtures and finishes you choose account for part of the cost. They also affect the labour. Some tile formats take more setting out and cutting, and some finishes need a flatter, better-prepared surface before they’ll look right and last.

When you compare options, look at the price of the product and also at what it needs from the surface it goes on.

Tradesperson working on floor tiles or grout beside a wall, with a watering can, mallet, tile pan and power saw visible nearby.

Floor tiling over a prepared substrate

2/4 · FACTOR · PREPARATION

The work you never see

Proper preparation matters as much as the visible result. That means taking out the old tiles, repairing or replacing wall sheeting, levelling floors and getting surfaces ready for tiling. None of it shows in the finished room, but a large share of the labour goes into it.

It’s also the part people are most tempted to trim. Skimping on preparation is the quickest way to get a new bathroom that lets you down early. You can see how Ivan handles each stage in the preparation-first renovation process.

3/4

FACTOR · PROJECT SCOPE

How much of the room is changing

Updating some tiles and fittings is a different job from stripping the room back to the substrate. If you’re unsure which one you need, Patch It Up or Strip It Back Properly? goes through the difference.

Scope also covers regulated trades. Ivan doesn’t carry out plumbing or electrical work himself. Where a renovation needs it, he arranges appropriately licensed specialists, and their work becomes part of the overall scope.

4/4

FACTOR · PROPERTY CONDITIONS

What the room is hiding

Every property comes with its own conditions: the age of the house, the state of the walls and floor, and whatever is behind the existing tiles. Some problems, like water damage under a floor, only show up once the old surfaces come off.

If that happens, Ivan tells you what he’s found and what it means for the job, then goes through your options with you. Cracked grout, loose tiles and other signs your bathroom needs renovating can sometimes hint at what’s underneath.

ASSESS BEFORE YOU PRICE

Why an assessment beats an instant figure

Any figure given without seeing the room has to allow for everything it doesn’t know. At an assessment, Ivan looks at the actual walls, floor, fittings and access, then tells you what’s clear, what isn’t and what could change the scope. That’s why he doesn’t give online instant quotes, and why you deal with him directly from the assessment through to completion.

WORTH THINKING ABOUT BEFORE YOU GET IN TOUCH

☐  What bothers you most about the room as it is now

☐  Whether you’re picturing a partial update or a full renovation

☐  Any signs of leaks, cracked grout, loose tiles or soft spots in the floor

☐  Tiles, fittings or finishes you already have in mind

☐  What you’d like to keep, and what has to go