JOB SHEET · LICENSED TRADES · MOORABBIN
Some parts of a bathroom renovation are regulated work. Ivan Bodnar is an independent renovation specialist, not a licensed plumber, electrician or registered building practitioner. When your renovation needs plumbing or electrical work, he brings in appropriately licensed specialists to do it rather than doing it himself, and you still deal with him directly from the first assessment through to completion.
Strip-out stage, with wiring and services exposed
SCOPE SUMMARY
What a renovation involves depends on your existing bathroom and on what the assessment finds.
IVAN BODNAR
Initial assessment and explaining your options
Strip-out and surface preparation
Plasterboard installation and plastering
Wall and floor tiling, flooring and interior finishing
Your direct point of contact from start to completion
APPROPRIATELY LICENSED SPECIALISTS
Regulated plumbing work
Regulated electrical work
Any other specialist work that requires an authorisation Ivan doesn’t hold
Ivan arranges these specialists and plans their work around the rest of the job.
HOW IT FITS THE JOB
In a bathroom, the order of work matters. Services behind the walls and under the floor have to be dealt with before the surfaces are closed in and tiled. That is why licensed work is planned as part of the renovation from the start. You can read more about the order of work on the preparation-first process page.
1 · ASSESS
During the assessment, Ivan looks at your existing bathroom and points out where the work you want is likely to involve plumbing or electrical changes, such as moving a fixture or changing a fitting. He tells you what he can assess at this stage and what is still uncertain.
2 · STRIP OUT
Once the old surfaces come off, conditions that were hidden can show up. If what’s behind the wall changes what’s needed, Ivan explains it plainly before the job goes any further.
3 · LICENSED WORK
The appropriately licensed specialists do their part at the right point in the job, while walls and floors are still open. Ivan plans the preparation work around them so that each stage is ready for the next.
4 · PREPARE & FINISH
Ivan then carries on with plasterboard, surface preparation, tiling and finishing. Proper preparation matters as much as the visible result, so the surfaces are made sound before anything goes on them.
WORTH ASKING EARLY
Ivan. He works with you directly from the initial assessment through to completion, so you don’t have to coordinate a separate list of trades yourself.
It can. Costs depend on materials, preparation, the scope of the project and the condition of the property. Moving or changing services is part of that scope. Ivan explains what affects bathroom renovation costs for your bathroom specifically.
Not always. The scope depends on existing conditions, and some of those only show once the bathroom has been stripped back. Ivan is clear about what he can confirm and what may still change.
PERSONAL RESPONSIBILITY
Ivan went independent so he could take personal responsibility for the work he does. Part of that is being straightforward about where his own work ends. His experience is in bathroom renovations, tiling, flooring, surface preparation and interior finishing. Regulated plumbing and electrical work needs the right authorisation, so it goes to people who hold it.
That way you know who is doing each part of your renovation, and why.
Exposed framing and wiring before walls are closed in
NEXT ON THE JOB SHEET
If you’re not sure whether your bathroom needs services moved or just new surfaces, start with Patch It Up or Strip It Back Properly? or Signs Your Bathroom Needs Renovating. When you’re ready, tell Ivan about your bathroom and he’ll talk you through what it is likely to involve. You can text or call on 0413 142 055, at times by arrangement.