Most of a bathroom renovation is work you never see. Ivan Bodnar is an independent bathroom renovation specialist with approximately 15 years of hands-on residential renovation experience. Every job he takes on starts with the same principle: proper preparation matters as much as the visible result. This page goes through the work order line by line, so you know what happens to your bathroom and why.
THE LINES ON THIS SHEET
Assess what’s there
Strip out to the substrate
Prepare walls and floors
Tile and finish
Licensed trades, coordinated
One person signs off every line, from the first assessment to completion.
Text or call · hours by arrangement
Text 0413 142 055
Strip-out stage: exposed structure before any new surface goes on
THE WORK ORDER
Four lines run in sequence. The fifth, licensed trades, sits alongside them wherever regulated plumbing or electrical work comes up. The numbers mark the order of the work. They aren’t timings.
01
LINE 01 · ASSESS
The scope of a renovation depends on the existing conditions, so it starts with an assessment. Ivan looks at the bathroom as it stands: the tiles, grout, fittings and finishes, and the wear that has made you think about renovating. That might be cracked grout, loose tiles, a layout that no longer suits your household or a room that’s simply hard to keep clean.
He then tells you plainly what he can assess from what’s visible, what remains uncertain, and what may affect the scope or the cost. There’s no instant figure on the spot. The aim is to help you make an informed decision.
WHAT STAYS UNCERTAIN
Behind the tiles. The condition of wall sheeting and framing can’t be fully seen until the tiles come off.
Under the floor. The substrate can turn out uneven or damaged once the old surface is lifted.
Earlier work. Previous repairs or patch-ups sometimes hide problems that only show at strip-out.
02
LINE 02 · STRIP OUT
Old tiles, fittings and finishes come out, and the walls and floor are taken back to what’s underneath. This is the point where concealed conditions show up, and why the scope agreed at assessment can change once work begins.
When something unexpected appears, you hear about it from Ivan directly. He explains what he’s found, what it means for the work and how it may affect scope or cost, so you can decide with full information. Because you deal with the same person from assessment to completion, nothing gets lost being passed along a chain of contacts.
Floor tiling on a prepared surface
03
LINE 03 · PREPARE
Before a single tile goes on, walls and floors need to be sound, even and ready to take the finish. Depending on what the strip-out reveals, that can mean plasterboard installation and plastering, levelling and preparing floor surfaces, and checking that each surface is right for what will sit on it.
Surface preparation is one of Ivan’s core skills. It’s slow, unglamorous work, and it’s what keeps tiles and finishes looking right well after the job is done.
04
LINE 04 · TILE & FINISH
With the surfaces prepared, the visible work begins: wall and floor tiling, flooring installation and interior finishing. Ivan does this work himself and keeps the same care for detail that went into the preparation. The finish is the result of everything done before it, so it’s checked against the same standard.
Ivan doesn’t carry out licensed plumbing or electrical work himself. When your bathroom renovation needs it, he coordinates appropriately licensed specialists and fits their work into the sequence above, so you still have one point of contact for the whole job. See Coordinating Licensed Specialists for how that works, and What Affects Bathroom Renovation Costs for how materials, preparation, scope and property conditions shape the final figure.