Home  /  Renovation Services  /  Flooring Installation

SERVICE 03 · FLOORING INSTALLATION · MOORABBIN

Flooring Installation

A new floor is only as flat, firm and lasting as the surface it sits on. Ivan Bodnar lays flooring as part of bathroom and residential renovations across Moorabbin and nearby Melbourne suburbs. Every job starts with what’s underneath.

Tradesperson working on floor tiles or grout beside a wall, with a watering can, mallet, tile pan and power saw visible nearby.

Floor tile installation in progress

CHECKED BEFORE A FLOOR GOES DOWN

☐  Is the substrate firm, or does it move underfoot?

☐  Is the surface flat enough, or does it need levelling first?

☐  Are there signs of water damage around the shower, bath or toilet?

☐  How will the new floor height meet doorways and adjoining rooms?

☐  What has to come up first, and what might that uncover?

Some of these questions can only be answered once the old floor has been lifted.

3.1

WHY THE SUBSTRATE MATTERS

What's underneath decides the finish

Most of a flooring job is work you never see. Proper preparation matters as much as the visible result, and floors show this more clearly than anything else. If the surface underneath is uneven or unsound, it tends to show through over time: tile edges that don’t sit flush, cracked grout, or a floor that never quite feels solid.

On a first visit, Ivan tells you plainly what he can assess, what is still uncertain and what could change the scope. Hidden conditions usually only show up during strip-out. That could be one old floor laid over another, a damaged section of substrate, or moisture that has been sitting under tiles. Because you deal with Ivan directly, he talks these findings through with you himself.

HOW THE JOB RUNS

From assessment to finished floor

The same order applies to every renovation. Read more about the preparation-first renovation process.

01

Assess

Ivan looks at the existing floor, how it feels underfoot, visible damage and how it meets the walls and doorways. Then he explains what he can see and what is still unknown.

02

Strip out & prepare

The old covering comes up and the substrate is checked again. Any repair, levelling or cleaning is done before a single tile or board is laid.

03

Lay & finish

The new floor goes down on a sound, prepared surface. Edges and transitions are finished to suit the room around it.

Demolished residential room with temporary steel support posts, exposed structural areas, rubble, plaster fragments, tools and open windows.

Strip-out, when concealed conditions come to light

3.2 · FLOORS WITHIN A RENOVATION

The floor is tied to everything around it

In a bathroom, the floor connects to the wall tiling, the shower area and the fixtures. Ivan plans it together with the wall and floor tiling and the plasterboard and plastering, so that heights and finishes line up across the room.

Moving a drain, relocating fixtures or any electrical work is carried out by appropriately licensed specialists, and Ivan coordinates them. See coordinating licensed specialists.

Ivan also installs flooring in other rooms as part of residential work, including kitchen and laundry renovations.

3.3 · SCOPE AND COST

Cost follows the condition of the floor

The cost of a flooring job depends on the materials, the preparation needed, the project scope and the condition of the property. A floor that only needs lifting and relaying is a different job from one that needs substrate repair first. Scope always depends on existing conditions and an assessment. For more detail, read what affects bathroom renovation costs.

If your floor is cracked, uneven, lifting or simply tired, describe your project and Ivan will talk you through what it might need. You can also text or call 0413 142 055 at a time that suits you both. Text 0413 142 055