SERVICE 11 — LAUNDRIES
A laundry takes water, weight and daily wear. The tub is filled and emptied, the washing machine can leak, and the floor gets mopped more than any other room. We renovate laundries in Moorabbin, Bentleigh, Cheltenham and Mentone with the same trades and the same order of work as a bathroom. That way the plumbing, membrane and tiles underneath are as well sorted as the cabinetry on top.
Laundry appliances in a tiled wet area, on the same kind of floor that needs a membrane underneath.
ON THIS PAGE
Same trades as Bathroom Tiling and Waterproofing.
11/A — ABOVE THE BENCH
Most laundry frustration comes down to order. Dirty clothes have nowhere to land, the dryer door hits the tub, or the bench is too short to fold on. Sorting the layout first also fixes where the waste, water and power points need to go before any wall is closed up. Our Bathroom Design service plans laundries the same way.
A
Putting the machines side by side under a bench gives you one long folding surface. Stacking the washer and dryer frees up wall length in a narrow room. Either way, the cavity sizes, tap and waste positions and any venting are settled at the design stage, not on the day the machines arrive.
B
Benchtops, overhead cupboards, tall broom storage and somewhere to hang clothes all compete for the same walls. We look at moisture-resistant cabinet materials near the tub, edges that suit wet hands, and how high the overheads can go without blocking a window or the light.
C
A tub in its own cabinet is simple and easy to replace later. An inset or under-mount sink in the benchtop looks built-in and is easy to wipe down. Each option needs different plumbing, so the tub is chosen at the same time as the cabinetry drawings.
Bedding: mortar spread out before large-format floor tiles are set.
11/B — UNDER THE FLOOR
A laundry is a wet area, so we treat the floor as one. The old cabinetry and floor come out, the plumbing goes in, and the surface is prepared. A continuous membrane then goes across the floor and into the wall junctions. We take extra care around the floor waste and where the tub and machines will sit. The membrane cures before any tile adhesive goes down.
Floor tiles are picked for grip underfoot as well as looks. They are bedded, laid to a planned set-out and grouted. If there is a floor waste, the floor is sloped so water runs to it and not towards the doorway.
Read more in the Bathroom Waterproofing Guide.
11/C — THE SEQUENCE
A laundry is smaller than most bathrooms, but it is built in the same order. See the full 12-step renovation process.
Combed adhesive, ready for splashback tiles.
01 CONSULTATION
How the room is used, and what isn’t working.
02 ASSESSMENT
Existing plumbing, floor condition and any signs of past leaks.
03 DESIGN
Layout, appliance spaces, cabinetry and where the tub goes.
04 QUOTE
A written scope based on the agreed design.
05 MATERIALS
Tiles, benchtop, cabinetry, tub and tapware chosen and ordered.
06 DEMOLITION
Old cabinets, tub and floor covering removed.
07 PLUMBING/ELECTRICAL
Waste, taps and power points moved to match the new plan.
08 WATERPROOFING
Membrane applied, then left to cure.
09 TILING
Floor and splashback tiles bedded, laid and grouted.
10 FIXTURES
Cabinetry, benchtop, tub and tapware installed.
11 FINISHING
Silicone, handles, final adjustments and a clean.
12 HANDOVER
A walk-through of the finished laundry.
11/D — QUESTIONS
Have something else to ask? Send it through the contact page or see the general Bathroom Renovation FAQs.
Yes. A laundry is a wet area, so the floor and its junctions are waterproofed before tiling. How far the membrane goes depends on the room and its fixtures, and that is confirmed during assessment and design.
Often, yes. Both rooms use the same trades and follow the same order of work, so they can be planned together. Full Bathroom Renovations explains how a whole wet area goes from demolition to handover.
Usually, as long as the waste and water can be run to the new spot. The assessment checks what is under the floor and inside the walls before the layout is locked in.
It depends on the scope, the materials and the curing time between stages. Your quote sets out the order of work for your room. Our guide How Long Does a Bathroom Renovation Take? goes through each stage.
Moorabbin and nearby suburbs, including Highett, Hampton East, Bentleigh East and Heatherton. See our service areas.
11/E — RELATED TRADES
Bathroom Tiling →
Set-out, bedding and grout for floors and splashbacks.
Waterproofing →
The membrane layer under every wet-area floor.
Full Bathroom Renovations →
Planning a bathroom and laundry as one project.
NEXT STEP
Tell us about the room, what bothers you about it now and what you would change. It is the starting point for consultation and assessment.