Services rough-in: waste, supply lines and valves set to the positions agreed in the design.
SERVICE 05 — BATHROOM DESIGN
Design is the layer drawn before anything is demolished. It fixes where the waste, water and power go, what sits on the walls and floor, and how much of the room has to be opened up. Settle those on paper and the build that follows has a clear scope, whether the bathroom is in Moorabbin, Bentleigh East or Cheltenham.
STEPS 01–04 OF 12
Our 12-step renovation process starts on paper. Consultation, Assessment, Design and Quote run in order, and each one narrows the decisions left for the next. By the time Materials are ordered, nothing about the room is still a guess.
01
We talk through how the room is used, what isn’t working and the finish you’re drawn to. Photos of the space and any saved images help a lot.
02
The existing room is checked: layout, wall and floor condition, where waste and supply currently run, and any signs of past water damage around the shower.
03
Layout, fixture positions and selections are drawn up together, so the plumbing plan and the tile plan agree before any trade is booked.
04
With the scope defined, the quote reflects the actual work: what is removed, what is moved and what is installed.
05/A — SCOPE
Some choices stay above the tile line. Others reach into the floor, the frame and the membrane. Knowing which is which is the point of planning.
Leaving the shower, basin and toilet wastes in their current positions usually keeps floor work contained. The look of the room can still change a great deal above that line.
Relocating a waste means opening the floor, re-running pipes and re-grading falls to the new drain. It is often worth doing, but it is a structural decision, not a cosmetic one.
A level-entry shower needs the floor set down or built up so water falls to the waste, and the membrane runs wider across the room. See Walk-In Showers for the options.
Floating vanities, wall-hung toilets and recessed shower niches need framing and blocking planned before the walls are sheeted, not added once tiling starts.
05/B — SELECTIONS
Choosing finishes during design, rather than mid-build, keeps every trade working to one fixed plan.
Tiles — format, finish and slip resistance on floors. Large formats change how falls are cut. Start with Bathroom Tile Ideas.
Tapware and shower — in-wall mixer bodies are set at rough-in, so the model is chosen early.
Vanity — width, depth and basin type decide the waste height.
Lighting and ventilation — positions confirmed before the electrical rough-in.
Screens — framed or frameless affects the threshold detail.
For stone, bespoke joinery or specialty fixtures, see Luxury Bathroom Renovations.
Wood-look wall tiles, a horizontal mosaic border, a white vanity and a large framed mirror.
05/C — QUESTIONS
It makes the quote meaningful. Without a defined layout and selections, a price can only describe intent. The Design step exists so the Quote step prices real work.
Compact rooms benefit most, because every clearance counts. See Small Bathroom Renovations and Ensuite Renovations.
No. It applies whenever positions or finishes change, from a new shower through to Full Bathroom Renovations.
Photos of the room, a short note of what isn’t working, and a few images of finishes you like. A rough measured sketch of the room is useful too.
Moorabbin and nearby suburbs, including Highett, Hampton East, Bentleigh, Bentleigh East, Cheltenham, Mentone and Heatherton. See service areas.
NEXT STEP — 05 MATERIALS
Tell us about the room and what you want it to do. Still weighing options? Read Bathroom Layout Ideas first, or send a question through the contact page.