Skip to main content

Bathroom Renovation Moorabbin

Moorabbin VIC 3189

Bathroom Renovations in Moorabbin

Complete bathroom rebuilds for houses, units and townhouses across Moorabbin. One trade, one crew, a written scope and a finished room in eight to fourteen working days.

Completed bathroom renovation with a stone-topped vanity, tiled walls and a glass shower screen

Overview

What a complete renovation covers

A complete renovation means the room comes back to the frame. We remove the fixtures and linings, check the bearers and joists for the damage that a slow shower leak leaves behind, then rebuild in the order a bathroom should be built: drainage, framing, sheeting, membrane, tile, fit-out.

Moorabbin housing stock gives us two recurring jobs. The first is the post-war brick veneer with a chipboard floor and a hobbed shower that has been resealed four times. The second is the 1970s or 80s unit where the stack cannot move, so the drainage has to be reworked inside the existing floor depth. Both are routine for us, and both are priced honestly at quote stage rather than discovered halfway through.

You get one point of contact for the whole build, a schedule with the stage each day belongs to, and a written variation any time the scope changes.

Benefits

Why owners choose a full rebuild over a patch

The leak stops for good

Resealing a failed hob buys a season. A new membrane, correct falls and a linear drain end the problem at the source.

Space you can feel

Level entry, wall-hung cabinetry and large-format tile give a small Moorabbin bathroom back its floor without moving a wall.

Value at resale

A dated wet area is the first thing a buyer prices down. A documented, compliant rebuild removes that argument.

One warranty trail

Fixtures, membrane and workmanship documented together, so a claim years later does not become detective work.

Process

How the build runs

Consultation

On-site look at the room, the subfloor and the switchboard.

Measure & Quote

Laser measure and a fixed written price with allowances.

Design & Planning

Setting-out drawings, tile layout, fixture schedule signed off.

Demolition

Protection down, room stripped, waste removed the same week.

Plumbing & Electrical

Rough-in by licensed trades, wastes and circuits reset.

Waterproofing & Tiling

Membrane photographed, cured, then tiled from the set-out.

Installation

Vanity, screen, tapware, mirror, seals and paint.

Final Inspection

Walk-through, punch list cleared, documents handed over.

Materials

Options we specify most often

  • Floor tile600×600 matt porcelain or stone-look rectified tile, slip rating checked for a wet floor.
  • Wall tileFull-height ceramic or porcelain, stack bond or offset, set out so corner cuts match on both walls.
  • ShowerLevel-entry recess with a linear drain, semi-frameless or frameless glass, niche sized to your bottles.
  • VanityWall-hung for floor space, floor-standing for storage, engineered stone or solid surface tops.
  • TapwareChrome, brushed nickel, matte black or brushed brass, matched across mixer, rail and waste.
  • WaterproofingMembrane to AS 3740 with bond breakers at every junction, photographed before tiling starts.
  • LightingIP-rated downlights zoned correctly, mirror or vanity lighting, separate switching for the fan.
  • VentilationDucted in-line extraction to the eave rather than into the roof cavity, sized to the room volume.

Project examples

Two recent Moorabbin builds

Older bathroom with small square tiles, a built-in bath and a dated shower screen
Before
Finished family bathroom with a freestanding bath, full-height tiling and brass tapware
After

Wickham Road, Moorabbin

Chipboard floor replaced, wastes relocated, hobbed shower rebuilt as a level-entry recess and the bath moved off the window wall.

Duration
11 working days
Services
Complete renovation, tiling, waterproofing
Small older bathroom with a low vanity and a shower over the bath
Before
Renovated small bathroom with a walk-in shower, niche shelf and pale stone-look tiles
After

Cochranes Road, Moorabbin

Unit bathroom of 4.2 square metres. Bath removed for a larger walk-in shower, drainage reworked inside the existing floor because the stack could not move.

Duration
9 working days
Services
Small bathroom renovation, vanity, tiling

FAQ

Questions about renovating in Moorabbin

Do you work on units and townhouses?

Yes. We handle body corporate notification requirements, work within the noise hours most owners corporations set, and plan drainage around a stack that cannot be moved.

Can the bathroom layout change?

Often, yes. Moving a basin or shower is straightforward. Moving the toilet depends on the position of the sewer connection, which we check at quote stage rather than guessing.

How much notice do you need?

Site visits are usually available within three working days. Once selections are locked in, a start date is typically two to four weeks out depending on tile lead times.

What paperwork do I receive at handover?

Waterproofing photographs and certification, plumbing and electrical compliance documents from the licensed trades, product warranties and care instructions for the surfaces we installed.

Next step

Book a measure and quote

Send the room dimensions and a couple of photos. We come back with a site visit time and a fixed written price.

Call nowFree quote