Wickham Road, Moorabbin
Chipboard floor replaced, wastes relocated, hobbed shower rebuilt as a level-entry recess and the bath moved off the window wall.
- Duration
- 11 working days
- Services
- Complete renovation, tiling, waterproofing
Moorabbin VIC 3189
Complete bathroom rebuilds for houses, units and townhouses across Moorabbin. One trade, one crew, a written scope and a finished room in eight to fourteen working days.
Overview
A complete renovation means the room comes back to the frame. We remove the fixtures and linings, check the bearers and joists for the damage that a slow shower leak leaves behind, then rebuild in the order a bathroom should be built: drainage, framing, sheeting, membrane, tile, fit-out.
Moorabbin housing stock gives us two recurring jobs. The first is the post-war brick veneer with a chipboard floor and a hobbed shower that has been resealed four times. The second is the 1970s or 80s unit where the stack cannot move, so the drainage has to be reworked inside the existing floor depth. Both are routine for us, and both are priced honestly at quote stage rather than discovered halfway through.
You get one point of contact for the whole build, a schedule with the stage each day belongs to, and a written variation any time the scope changes.
Benefits
Resealing a failed hob buys a season. A new membrane, correct falls and a linear drain end the problem at the source.
Level entry, wall-hung cabinetry and large-format tile give a small Moorabbin bathroom back its floor without moving a wall.
A dated wet area is the first thing a buyer prices down. A documented, compliant rebuild removes that argument.
Fixtures, membrane and workmanship documented together, so a claim years later does not become detective work.
Process
On-site look at the room, the subfloor and the switchboard.
Laser measure and a fixed written price with allowances.
Setting-out drawings, tile layout, fixture schedule signed off.
Protection down, room stripped, waste removed the same week.
Rough-in by licensed trades, wastes and circuits reset.
Membrane photographed, cured, then tiled from the set-out.
Vanity, screen, tapware, mirror, seals and paint.
Walk-through, punch list cleared, documents handed over.
Materials
Project examples
Chipboard floor replaced, wastes relocated, hobbed shower rebuilt as a level-entry recess and the bath moved off the window wall.
Unit bathroom of 4.2 square metres. Bath removed for a larger walk-in shower, drainage reworked inside the existing floor because the stack could not move.
FAQ
Yes. We handle body corporate notification requirements, work within the noise hours most owners corporations set, and plan drainage around a stack that cannot be moved.
Often, yes. Moving a basin or shower is straightforward. Moving the toilet depends on the position of the sewer connection, which we check at quote stage rather than guessing.
Site visits are usually available within three working days. Once selections are locked in, a start date is typically two to four weeks out depending on tile lead times.
Waterproofing photographs and certification, plumbing and electrical compliance documents from the licensed trades, product warranties and care instructions for the surfaces we installed.
Next step
Send the room dimensions and a couple of photos. We come back with a site visit time and a fixed written price.